โš™ CalibKeepr Plant 1 ยท ISO 9001 / IATF 16949
๐Ÿ“ Calibration Specs (SOPs)

CalibKeepr ยท Equipment Inventory

Factory Tools, Gauges & Cycle Counters

Manage precision tools across work cells, link each tool to its required Calibration SOP and NIST Reference Standard, and track both calendar and cycle-count intervals.

Active Production Tools & Instruments

Tools automatically trigger reminders when approaching either their calendar due date or their maximum cycle threshold.

8 active tool(s)
TMP-505 Heat Treat & Hydraulic Test Bay
Quarantined (OOT)

Omega Platinum RTD Curing Oven Probe #1 (50–250 °C)

Omega Engineering ยท Model: PR-21-2-100-A ยท S/N: OMG-908122
Assigned SOP: SOP-CAL-510 (Curing Oven RTD & Infrared Pyrometer Dry-Block Calibration (50–250 °C))
Master Standard: STD-TMP-04 (NIST-831/509311-26)
Storage / Station: Composite Curing Oven #1 Zone A
Calendar Schedule: Every 90 days ยท Next: Dec 26, 2026
๐Ÿ”„ Cycle Trigger: 0 / 1,000 cycles 0%
Total lifetime: 1,890 cycles
TRQ-204 Final Assembly Line 2
Overdue (5d)

Snap-on TechAngle Electronic Torque Wrench (10–100 Nm)

Snap-on Industrial ยท Model: ATECH2FR100B ยท S/N: SN-8849201
Assigned SOP: SOP-CAL-204 (Electronic & Click Torque Wrench Verification (20%, 60%, 100% Scale))
Master Standard: STD-TRQ-02 (NIST-822/771204-25)
Storage / Station: Station 4 Shadowboard — Bay B
Calendar Schedule: Every 60 days ยท Next: Oct 4, 2026
๐Ÿ”„ Cycle Trigger: 1,720 / 2,500 cycles 69%
Total lifetime: 14,820 cycles
PRG-302 Heat Treat & Hydraulic Test Bay
Overdue (3d)

Ashcroft Digital Test Pressure Gauge (0–500 PSI)

Ashcroft ยท Model: 2089-PSI-500 ยท S/N: ASH-119204
Assigned SOP: SOP-CAL-405 (Hydraulic Digital Pressure Gauge 4-Point Rising/Falling Calibration (0–500 PSI))
Master Standard: STD-PRS-03 (NIST-836/610942-26)
Storage / Station: Hydraulic Manifold Stand #1
Calendar Schedule: Every 120 days ยท Next: Oct 6, 2026
๐Ÿ”„ Cycle Trigger: 300 / 1,500 cycles 20%
Total lifetime: 3,400 cycles
TRQ-209 Final Assembly Line 2
Cycle Limit (2,640/2,500)

Desoutter DC Electric Nutrunner Spindle #2 (10–100 Nm)

Desoutter ยท Model: EAD-100-C ยท S/N: DES-510392
Assigned SOP: SOP-CAL-204 (Electronic & Click Torque Wrench Verification (20%, 60%, 100% Scale))
Master Standard: STD-TRQ-02 (NIST-822/771204-25)
Storage / Station: Subframe Station 2 Overhead Boom
Calendar Schedule: Every 60 days ยท Next: Oct 31, 2026
๐Ÿ”„ Cycle Trigger: 2,640 / 2,500 cycles 106%
Total lifetime: 22,640 cycles
CAL-104 CNC Machining Cell A
Due in 4d

Mitutoyo Absolute Digimatic Caliper 0–150 mm

Mitutoyo ยท Model: 500-196-30 ยท S/N: MIT-3391042
Assigned SOP: SOP-CAL-101 (Digital & Dial Caliper 4-Point Dimensional Calibration (0–150 mm))
Master Standard: STD-GB-01 (NIST-821/294810-26)
Storage / Station: CNC Mill #3 Inspection Drawer
Calendar Schedule: Every 90 days ยท Next: Oct 13, 2026
๐Ÿ”„ Cycle Trigger: 3,920 / 5,000 cycles 78%
Total lifetime: 8,120 cycles
MIC-112 CNC Machining Cell A
Due in 9d

Starrett Coolant-Proof Outside Micrometer 0–25 mm

Starrett ยท Model: 795.1XFL-25 ยท S/N: STR-774019
Assigned SOP: SOP-CAL-302 (Outside Micrometer Optical Flat & Gage Block Calibration (0–25 mm))
Master Standard: STD-GB-01 (NIST-821/294810-26)
Storage / Station: CNC Turning Center #1 Cabinet
Calendar Schedule: Every 180 days ยท Next: Oct 18, 2026
๐Ÿ”„ Cycle Trigger: 2,620 / 3,000 cycles 87%
Total lifetime: 6,720 cycles
CAL-108 Quality Metrology Lab
Calibrated

Mitutoyo Digimatic Height Gauge & Master Caliper

Mitutoyo ยท Model: 500-197-30 ยท S/N: MIT-441209
Assigned SOP: SOP-CAL-101 (Digital & Dial Caliper 4-Point Dimensional Calibration (0–150 mm))
Master Standard: STD-GB-01 (NIST-821/294810-26)
Storage / Station: Metrology Surface Plate #1
Calendar Schedule: Every 90 days ยท Next: Dec 14, 2026
๐Ÿ”„ Cycle Trigger: 650 / 5,000 cycles 13%
Total lifetime: 2,450 cycles
MIC-118 Quality Metrology Lab
Calibrated

Mitutoyo QuantuMike IP65 Digital Micrometer 0–25 mm

Mitutoyo ยท Model: 293-185-30 ยท S/N: MIT-882014
Assigned SOP: SOP-CAL-302 (Outside Micrometer Optical Flat & Gage Block Calibration (0–25 mm))
Master Standard: STD-GB-01 (NIST-821/294810-26)
Storage / Station: Metrology Lab Bench 2
Calendar Schedule: Every 180 days ยท Next: Mar 19, 2027
๐Ÿ”„ Cycle Trigger: 170 / 3,000 cycles 6%
Total lifetime: 1,120 cycles
An unhandled error has occurred. Reload ๐Ÿ—™